Release 6.30 - March 29, 2024

  • Add Global Configuration providing the ability to define the Near Critical threshold
  • Customizable Reporting (BETA)
    • Add "Duplicate" report button
    • Fix an issue causing the Monthly Distribution Table to be cut off in a Full Page rendering
  • Reporting
    • Add a message indicating when an activity's activity ID or name has changed between the two schedules utilized in the SHS/SHF report
    • Fix where Favorite Reports were not saving
    • Ensure filtering in the SHS/SHF takes into account both window endpoints
    • Better handle when the start of window schedule is already at 100% planned percent complete in the Progress section of the Narrative Report
  • Gantt Chart
    • Add Source Start Date and Source End Date column options
    • Add Baseline Start Date and Baseline End Date column options
  • Schedule Quality
    • Add Milestone Filtering to Logic Tie Fields in the Schedule Quality Editor
    • Fix an issue causing the Schedule Quality page to not populate if a tracked-to milestone was deleted in the schedule
  • Fix a UI issue with adding logic during a One Off Change
  • Fix an issue causing the Comments button not to alert when there is a new comment